PROJECT:Removal of floor covering
LOCATION:Wiltshire
TEAM:Bristol
Old floor coverings removed 
We’ve stripped back the existing flooring, treated and sealed the exposed bitumen adhesive, and prepared the subfloor — all ready for contractors to install brand new toilets and showers.
Another project moving smoothly forward in Wiltshire
Follow us on Instagram rightway_environmental_ltd




