CASE STUDY- Asbestos Insulating Board Roof Removal

2026-03-02T14:09:32+00:00

🏗️ Case Study: Asbestos Insulating Board Roof Removal Client: Local Company Asbestos Removal Contractor: Rightway Environmental Ltd Location: Abingdon, Oxon Project Start Date: 17/11/2025 Project Type: Licensed Asbestos Removal 🧱 Project Overview Rightway Environmental were appointed by a local compnay to carry out [...]

CASE STUDY- Asbestos Insulating Board Roof Removal2026-03-02T14:09:32+00:00

WINCHCOMBE RAILWAY PROJECT

2025-11-20T10:55:54+00:00

Project Overview — Gloucestershire Warwickshire Steam Railway (GWSR) Project Name: Gloucestershire Warwickshire Steam Railway (GWSR) Scope of Work A full hygiene clean of the railway carriage, preparing it for rejuvenation and restoration. Works include: Deep interior clean of seating, floors and fixtures Sanitisation [...]

WINCHCOMBE RAILWAY PROJECT2025-11-20T10:55:54+00:00

CASE STUDY – West Fraser Europe Limited, South Molton

2025-11-17T11:38:27+00:00

Project Overview We are currently delivering a  asbestos removal project at the former West Fraser Europe manufacturing facility located at South Molton, EX36. The works commenced at the end of October and are scheduled to run for five months. The project focuses on [...]

CASE STUDY – West Fraser Europe Limited, South Molton2025-11-17T11:38:27+00:00

Case Study- Tone Works Project, Somerset

2025-11-11T15:46:53+00:00

Case Study: Asbestos project in Wellington, Somerset  Project Name: Tone WorksSite Address: Wellington, SomersetClient Name: Corbel Conservation Ltd Project Overview During the cleaning phase, the team carefully prepared and decontaminated the affected wall surfaces. The main goal was to remove all visible residue [...]

Case Study- Tone Works Project, Somerset2025-11-11T15:46:53+00:00

Kingswood Project- Case Study

2025-11-07T10:46:03+00:00

🏗️ Case Study: Asbestos Removal & Demolition Preparation – South Gloucestershire Regeneration Project Client: Housing Association Asbestos Removal Contractor: Rightway Environmental Location: South Gloucestershire Phase: Pre-Demolition Works Date: March 2025 🧱 Project Overview Rightway Environmental were appointed to undertake the safe removal and [...]

Kingswood Project- Case Study2025-11-07T10:46:03+00:00

ASBESTOS WORKS COMPLETED

2025-02-14T11:20:04+00:00

ASBESTOS WORKS COMPLETED PROJECT: Cover ceiling with fire rated plasterboard, remove and dispose of pipes, residue removal, environmental clean and re-encapsulation. LOCATION: Cirencester TEAM:Bristol We also offer waste collection, sampling and surveys- please visit our website for more information: Call 01752 964073 or [...]

ASBESTOS WORKS COMPLETED2025-02-14T11:20:04+00:00

MILTON PARK CASE STUDY

2024-11-07T14:03:02+00:00

Rightway Environmental have played a big part in the demolition of historical war-time buildings which is allowing room to be made for parking for an industrial site. Milton Park in Didcot began as an RAF depot and was used during World War Two [...]

MILTON PARK CASE STUDY2024-11-07T14:03:02+00:00

CASE STUDY- House of Fraser- Bournemouth

2024-10-17T17:42:46+00:00

Rightway Environmental have been working alongside a demolition company removing existing asbestos containing materials in preparation for new development schemes. While the demolition company were soft stripping this historic building peeling back the layers, asbestos containing materials had been exposed. Requiring our trained [...]

CASE STUDY- House of Fraser- Bournemouth2024-10-17T17:42:46+00:00

Residential Properties

2023-06-21T13:19:06+00:00

Residential Properties ASBESTOS IN RESIDENTIAL PROPERTIES Our Bristol team have been in Gloucestershire to carry out the removal of asbestos insulation board ceiling panels to the garage and utility area of this residential property. The type of asbestos removed was amosite and [...]

Residential Properties2023-06-21T13:19:06+00:00

Relyon, Taunton, Somerset

2021-06-11T15:18:14+00:00

Lancer Scott Working on behalf of Lancer Scott, Rightway Environmental were employed to remove 600m2 of Asbestos Insulating Board from high level within large warehouses. Although the AIB was in good condition it had to be removed to facilitate the large scale [...]

Relyon, Taunton, Somerset2021-06-11T15:18:14+00:00
Go to Top